论文部分内容阅读
利用计划密植封行及郁闭园间移的猕猴桃大株,重新建园栽植,能迅速获得经济产量,实现较好的经济效益。要保证大株猕猴桃移栽成活率,需要掌握以下技术要点:1.移前断根。猕猴桃采果后落叶前,在离计划间移株主干40~50厘米处的地面挖宽20厘米、深30~40厘米的环沟,切断骨干根,剪齐伤口。在沟内施入腐熟土杂肥及速效氮磷肥,灌水复土,促发新根,以利提高移栽成活率,缩短缓苗期。
Utilize the large planted kiwifruit planted between the dense seal pack and the canyon in the plan and rebuild the park for planting, which can quickly obtain the economic output and achieve better economic benefits. To ensure the survival rate of large-scale kiwi transplanting, you need to master the following technical points: 1. Remove the root before the move. Kiwi fruit picking deciduous leaf before the transfer plan from the main trunk 40 to 50 cm at the ground digging width of 20 cm, 30 to 40 cm deep groove, cut off the backbone of the root, cut the wound. In the trench into the rotten miscellaneous fertilizer and available nitrogen and phosphorus fertilizer, irrigation complex soil, promote new roots, in order to enhance the survival rate of transplanting, shorten the hibernation stage.