介绍了外墙外保温的优越性、基本构造、对工程质量和材料使用的要求。具体介绍了中英合作改建和新建的两栋示范建筑所采用的外墙外保温的选材与施工,并进行了技术经济分析,结果表明:以北京地区为例,24cm砖墙加5cm聚苯乙烯外保温做法与传统37cm砖墙做法相比,投资回收期为3.1年;新建建筑全部外保温费用远低于由于采用外保温而增加使用面积的增值。
Introduced the advantages of the external insulation of the external wall, the basic structure, the requirements of the project quality and material use. The selection and construction of the external insulation used in the two demonstration buildings of Sino-British cooperation and reconstruction and new construction were introduced in detail, and a technical and economic analysis was conducted. The results showed that: Taking Beijing as an example, 24cm brick wall plus 5cm polystyrene Compared with the practice of traditional 37cm brick wall, the external insulation method has a payback period of 3.1 years; the external insulation cost of new construction is much lower than the increase in use area due to external insulation.