我国第一座具有一定规模、目的为开发潮汐能进行试验的电站——浙江温岭江厦潮汐试验电站,继1980年8月第一台(一号)水轮发电机组投产以后,1984年4月三号机组又投入运行。这两台双向贯流式试验机组额定出力分别为500千瓦和700千瓦,结构不同,也是目前国内最大的两台潮汐发电机组。几年来,江厦电站工程承担的国家科研任务有潮汐能利用的特性、双向贯流式机组的研制和运行、海工建筑物的技术问题以及水库区综合开发利用等,已经取得了初步成果。另外,对机组金属体表面防止海生物附着生长、防止受海水
China’s first hydropower plant with a certain scale and purpose for testing tidal energy - Zhejiang Wenling Jiangxia Tidal Power Station, following the commissioning of the first (No. 1) hydroelectric generating set in August 1980, April 1984 Unit 3 put into operation again. The two two-way tubular test unit rated output of 500 kilowatts and 700 kilowatts, respectively, with different structures, but also the current two largest tidal power generating units. Over the past few years, Jiangxia Power Station project undertaken by the state has the characteristics of tidal energy research and development, the development and operation of two-way tubular unit, the technical problems of offshore structures and the comprehensive development and utilization of reservoir area, has achieved initial results. In addition, the metal surface of the unit to prevent the growth of marine organisms attached to prevent the sea water