通过对莞惠14标走行线区间隧道下穿既有京九铁路线地质情况及工程难点的分析,隧道洞内主要采用上半断面深孔预注浆超前支护技术来保证开挖过程的稳固安全。注浆孔分9环呈辐射状,注浆孔深约8m,14m,20m。注浆材料采用水泥-水玻璃双液浆材,注浆压力为2.5~4.5MPa。注浆顺序为先隧道中间后周边,各孔交替注浆。经监测数据显示地层变形得到很好的控制,下穿段隧道已顺利完成施工,效果良好。
Through the analysis of the geological conditions and engineering difficulties of Guanghui 14 standard cross-section tunnel under the existing Jing-Jiu-Jiu railway line, the advanced semi-section deep-hole pre-grouting advanced support technology is adopted in the tunnel to ensure the stable excavation process Safety. Grouting hole 9 rings were radial, grouting hole depth of about 8m, 14m, 20m. Grouting material using cement - water glass slurry, grouting pressure of 2.5 ~ 4.5MPa. Grouting sequence for the first tunnel around the middle, the holes alternately grouting. The monitoring data show that the formation deformation is well controlled, and the section tunnel has been successfully completed and the construction works well.