通过对莞惠14标走行线区间隧道下穿既有京九铁路线地质情况及工程难点的分析,隧道洞内主要采用上半断面深孔预注浆超前支护技术来保证开挖过程的稳固安全。注浆孔分9环呈辐射状,注浆孔深约8m,14m,20m。注浆材料采用水泥-水玻璃双液浆材,注浆压力为2.5~4.5MPa。注浆顺序为先隧道中间后周边,各孔交替注浆。经监测数据显示地层变形得到很好的控制,下穿段隧道已顺利完成施工,效果良好。 Through the analysis of the geological conditions and engineering difficulties of Guanghui 14 standard cross-section tunnel under the existing Jing-Jiu-Jiu railway line, the advanced semi-section deep-hole pre-grouting advanced support technology is adopted in the tunnel to ensure the stable excavation process Safety. Grouting hole 9 rings were radial, grouting hole depth of about 8m, 14m, 20m. Grouting material using cement - water glass slurry, grouting pressure of 2.5 ~ 4.5MPa. Grouting sequence for the first tunnel around the middle, the holes alternately grouting. The monitoring data show that the formation deformation is well controlled, and the section tunnel has been successfully completed and the construction works well.
其他文献
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
柴油机今非昔比rn一直以来,由于我国柴油机技术发展与国际先进水平的巨大落差,使我们许多人脑子里的柴油机还停留在五、六十年代,因此在治理汽车尾气排放时,一直把装备柴油机
主要以江苏省南京地区的地层岩性及地质构造条件为依据,以极限平衡理论为基础,运用geo-studio软件中的SLOPE/W模块和VADOSE/W模块来计算分析边坡在天然工况和暴雨工况下,边坡
在多层建筑的结构与装饰工程施工中,材料的垂直运输目前绝大多数采用井字架物料提升机,即通常所称的“井架”方式。
该文结合西南某大面积山区填方工程,通过对其边坡损毁、孔洞展布和排水系统损坏特征等方面的调查、试验和系统分析,得出了上述高填方体出现变形和破坏的主要原因是地下水渗透
以忠武管道沿线中的水洞坪边坡工程为背景,为了确保施工期的安全和获得全面的边坡地表位移监测数据,采用GPS三维监测技术对边坡地表位移进行了长期的监测。基于此,对监测数据
地理国情要素是地理国情普查成果的重要组成部分,该文结合武汉市地理国情普查试点工作的技术和要求,详细阐述了普查试点工作中地理国情要素与基础地理数据的区别和联系,对两
排土场大量堆存的散体容易诱发泥石流、滑坡等地质灾害,研究散体的物理力学性质是分析排土场边坡稳定性的重要环节。该文应用分形几何理论和现场原位大面积直剪试验,通过对大