一、前言目前,国内在混凝土坝施工中,水平施工缝的处理大多采用人工凿毛,风砂枪冲毛或用低压水冲洗初凝之混凝土面等施工方法。人工凿毛效率低,劳动强度大,每一千平方米水平缝要凿去混凝土30米~3。风砂枪冲毛污染严重,且仓面清理工作量大。而用低压水冲洗初凝之混凝土面,不仅冲走大量水泥砂浆扰动混凝土表层,且会再生乳皮。总之,现行的水平施工缝处理方法都已陈旧,不能适应现代生产的需要。近十几年来,国外混凝土坝工程开始采用高压水处理水平施工缝。据《国外水利水电消息》78年21期报导,近年来采用该法的工程有:美国的德沃歇克重力坝(坝高219米,体积
I. Preface At present, in the construction of concrete dams, the construction methods of horizontal construction joints mostly adopt artificial cutting hair, sand blasting with wind sand gun or washing concrete surface with initial pressure setting with low pressure water. Artificial hair cutting efficiency is low, labor-intensive, every thousand square meters of horizontal seam to chisel concrete 30 ~ 3. Wind sand gun hair pollution is serious, and the warehouse to clean up the workload. The initial setting of the concrete surface with low pressure water rinse, not only washed away a large number of cement mortar disturbance concrete surface, and will regenerate the milk skin. In short, the current horizontal construction joint processing methods are old, can not meet the needs of modern production. In recent decades, foreign concrete dam project began to use high-pressure water level construction joints. According to “foreign water conservancy and hydropower news” 78 years 21 reports, in recent years, the project uses the law: the United States Dvorak gravity dam (dam height 219 meters, the volume