论文部分内容阅读
采用原型试验前的水库运用方式与水利部报国务院的水库运用方式进行比较分析对水电站发电影响,原型试验前的水库运用方式为:汛期当潼关流量大于2500m3/s时敞泄,否则按305m控制;非汛期最高运用水位321~322m。水利部报国务院的运用方式为汛期敞泄;非汛期最高水位不超过318m,平均水位不超过315m。针对因调整水库运行方式给三门峡枢纽局造成的发电收入损失,结合具体情况,提出补偿措施方案。
Before the prototype test, the reservoir operation mode and the Ministry of Water Resources reported to the State Council’s reservoir operation mode to compare the impact on the hydropower station power generation. The reservoir operation mode before the prototype test is as follows: when the discharge of Tongguan is greater than 2500m3 / s in flood season, ; Non-flood season the highest water level 321 ~ 322m. Ministry of Water Resources reported to the State Department for the use of open flood season; the highest non-flood season does not exceed 318m, the average water level does not exceed 315m. In view of the loss of generating revenue due to the adjustment of the reservoir operation mode to the Sanmenxia Dam Station, the compensation plan is put forward according to the specific conditions.