三门峡水库运用方式调整对水电站发电影响及补偿措施

来源 :河南水利与南水北调 | 被引量 : 0次 | 上传用户:ad5260
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
采用原型试验前的水库运用方式与水利部报国务院的水库运用方式进行比较分析对水电站发电影响,原型试验前的水库运用方式为:汛期当潼关流量大于2500m3/s时敞泄,否则按305m控制;非汛期最高运用水位321~322m。水利部报国务院的运用方式为汛期敞泄;非汛期最高水位不超过318m,平均水位不超过315m。针对因调整水库运行方式给三门峡枢纽局造成的发电收入损失,结合具体情况,提出补偿措施方案。 Before the prototype test, the reservoir operation mode and the Ministry of Water Resources reported to the State Council’s reservoir operation mode to compare the impact on the hydropower station power generation. The reservoir operation mode before the prototype test is as follows: when the discharge of Tongguan is greater than 2500m3 / s in flood season, ; Non-flood season the highest water level 321 ~ 322m. Ministry of Water Resources reported to the State Department for the use of open flood season; the highest non-flood season does not exceed 318m, the average water level does not exceed 315m. In view of the loss of generating revenue due to the adjustment of the reservoir operation mode to the Sanmenxia Dam Station, the compensation plan is put forward according to the specific conditions.
其他文献
期刊
水库移民后期扶持工作不仅是一个经济发展问题,更是政治和社会稳定问题。针对安阳市水库移民生产生活中存在的难点、热点和焦点问题,提出通过明确移民扶持发展方向、强化项目
水库自动化系统主运行模式按照国家自动化通讯标准,设备性能优良、功能完善、安全可靠,在节约及降低成本的前提下,让自动化系统在水库工程管理中得到充分应用,对保证水库安全
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
日前,由五莲县委组织部、县委老干部局、县文学艺术界联合会、县旅游和文化体育广播电视局联合主办,县老干部大学、博物馆、文化馆联合承办的“喜迎党的十九大”全县老干部书
乳腺癌是妇女最常见的恶性肿瘤(31%),其死亡率仅次于肺癌而位居第二[1]。恶性肿瘤细胞的转移是主要致死因素,而淋巴道转移是主要转移途径之一。据统计,常规病理检查淋巴结阴
信息化建设是灌区节水改造项目的主要内容之一,信息化管理是高效利用水资源的一种有效途径。文章对昭平台灌区管理现状进行了分析,提出了灌区信息化建设的必要性和建设目标,
目的 :观察盐酸恩丹西酮的不同用法防治肿瘤化疗所致恶心、呕吐的疗效。方法 :对 119例恶性肿瘤化疗患者随机分成盐酸恩丹西酮 1天用药组 (5 5例 )和 3天用药组 (6 4例 )。 1
通过回顾商丘市防汛信息化建设历程及其运行情况,研究分析了其建设与应用过程中存在的问题和原因,系统地提出了加快商丘市防汛信息化建设的意见和建议,为防汛信息化建设的良