随着我国高速铁路的迅速发展,无缝长钢轨的施工已经成为铁路发展的主要施工内容,也代表着高速铁路轨道发展的技术水平。长钢轨铺设后,须对长钢轨进行多次调整(俗称的轨道精调),使其几何状态符合设计要求,加强轨道精调质量对于保证线路质量达标以满足列车350km/h的速度要求,定期开展联调联试及动态验收工作,起到至关重要的作用。笔者参加过京沪高速铁路无砟轨道静态,动态两个阶段的技术实践,对轨道精调技术进行了系统的研究,本文对轨道精调技术进行一些讨论,通过轨道精调施工的前期策划准备、人员、设备资源的配置,从而影响其工期以及经营情况。
With the rapid development of high-speed railway in our country, the construction of seamless long rail has become the main construction content of railway development and also represents the technical level of the development of high-speed railway tracks. Long rail laying, the rail must be repeated on many adjustments (commonly known as the orbit fine), so that its geometric state meets the design requirements, to strengthen the quality of the track fine tune to ensure line quality standards to meet the train 350km / h speed requirements, regular Undertake joint commission test and dynamic acceptance work, play a vital role. I participated in the Beijing-Shanghai high-speed railway ballastless orbit static and dynamic two stages of technical practice, the trajectory fine tuning techniques for a systematic study of the trajectory fine tuning techniques for some discussion, through the orbit fine-tuning construction preparatory planning , Personnel, equipment resources allocation, thus affecting the duration and operating conditions.