论文部分内容阅读
针对矿井在新建水平后通风系统发生大幅度变化的情况下,为了保证通风网络与矿井主通风机的同步匹配,利用自编软件和风网解算技巧,对矿井风机能力提前作出评估,以便及时采取合理的措施,确保矿井的安全生产及采掘与通风关系的顺利衔接。
In view of the drastic changes of the ventilation system after the new level of the mine, in order to ensure the synchronous matching between the ventilation network and the main ventilator of the mine, self-made software and the wind net solving skill are used to evaluate the mine fan capacity in advance so as to take timely measures Reasonable measures to ensure the smooth production of mine safety and the connection between mining and ventilation.