工程投资控制应以提高工程效益为主线,解放思想,把长期以来以防御超概算为目标的造价控制思想改到能够衡量工程效益得失的天平上去。树立投资控制为质量控制、进度(工期)控制服务的思想,建立与现代化工程建设管理相适应的投资管理体系,把投资控制工作纳入标准化,科学化的管理轨道,促进三峡工程建设的顺利实施。
Project investment control should be based on improving engineering efficiency as the main line, emancipating the mind, the cost control thinking for a long time to defensive over budget estimates as the goal can be measured to measure the gains and losses of the project balance up. Establish investment control as the quality control and schedule (duration) control service, establish an investment management system compatible with modern engineering construction management, integrate investment control into standardized and scientific management, and promote the smooth implementation of the Three Gorges Project.