论文部分内容阅读
一、工程概述崔楼抽水站座落在丰县张五楼乡崔楼村南,是丰沛运河上段疏浚配套工程的主要项目之一.1、主要设计数据丰沛运河河底高程+33.70m(废黄河口基面),边坡1:4,地面高程+39.20m,上游设计水位+39.00m,下游设计水位+36.00m,枯水位+34.70m,进水池底板高程+33.00m,出水池底板高程+37.00m.根据灌溉要求,安装20ZLB-70型轴流泵一台套,配用4120型柴油机.站基土质为粉砂土.
I. Overview of the Project Cui Lou Pumping Station is located in the south of Cui Lou Village, Zhangwu Building, Zhang County, Fengxian County, which is one of the major projects of the dredging supporting works of the upper part of the Canal. (1) The main design data Abundance of the river bottom of the Canal + 33.70m Mouth surface), slope 1: 4, ground elevation + 39.20m, upstream design water level + 39.00m, downstream design water level + 36.00m, dry water level + 34.70m, into the pool floor elevation + 33.00m, 37.00m. According to the irrigation requirements, a 20ZLB-70 axial flow pump is installed and equipped with 4120 diesel engine.