摘要:伴随着我国国民经济的高速发展,对于人居建筑环境的质量要求逐步提高,对于建筑水电安装质量要求也有所提高。但是,在水电安装过程中总会遇到一些因预控措施做不到位引起的施工质量问题。本文主要针对建筑水电安装工程的这些技术问题提出个人的见解,并作初浅的分析和讨论,同时对其相关问题的预防整治措施作进一步的归纳总结,便于同行朋友共同交流学习。
Abstract: Along with high-speed development of our national economy, the living building environmental quality requirements gradually increase, the construction of hydropower installation quality is improved. However, in the water and electricity installation process always meet some for pre-control measures do not to reach the designated position caused by quality problems in construction of. This article mainly aims at the construction of hydropower installation of these technical problems put forward the individual's opinion, and make a preliminary analysis and Discussion on its relevant problems, at the same time the prevention measures for further summarized, facilitating peer friends share learning
关键词:建筑水电、安装工程、技术问题、预防措施
中图分类号:TM05 文献标识码:A 文章编号:
Key Words: construction of hydropower installation engineering, technology, problems, preventive measures
水电安装是建筑安装工程的重要组成部分。水电安装施工质量的好坏直接影响整体建筑工程的使用质量。虽然国家和地方有关部门都对水电安装工程的施工质量制定了一系列的规范标准,但是很多的施工企业在具体的施工过程中还是存在诸多违背规范的做法,导致其安装质量出现很多问题。目前,我国建筑安装工程施工出现的质量通病主要包括给排水工程的渗漏和堵塞情况、电气安装的漏电和短路情况等。
建筑工程水电安装施工技术的问题分析
(1)给排水管道的安装问题
建筑工程给排水施工过程中,对于每条管道布置位置要合理,按照施工方案有序作业,才能够保证给排水管道安装施工的质量。给排水管道安装施工主要出现的通病有:管材质量问题诸如管壁太薄、管径不足、镀锌厚度不足等问题;安装排水横管出现倒坡现象; PVC-U管壁污秽情况严重、伸缩节设置位置存在偏差、穿楼板处存在漏渗情况;管道阀门安装启闭装置不够灵活;建筑屋面水箱预埋防水套管制作工艺不规范导致制品不符合标准、预埋管道的坡度拿捏不准等。
(2)室内卫生间器具的安装问题
卫生间内部空间的器具及配件的安装未按照设计施工图纸的标准尺寸进行安装作业,选取的卫生器具及系统配件的材质不良等情况都是造成给排水工程后续使用问题的原因。
(3)建筑清扫口、检查口和地漏等关键部位的施工问题
清扫口、检查口和地漏等建筑水电安装关键部位的施工问题主要发生原因在于检查口位置设置不够合理、清扫口距离墙面不符合规范要求的净距离、地漏未设置安装水封装置及地漏安装标高不合理等情况。
(4)电气工程的管线预埋与敷设问题
建筑电气工程的管线敷设问题也是一直困扰建筑工程施工的一方面内容。管线预埋与敷设施工存在的问题多由于其管材的选择和连接所造成。例如绝缘导管连接套管直径选择不合适,过大,造成连接处粘接不严密牢固;管材管壁厚度不足,使导管弯曲处出现弯扁现象;管口在盒内长短不一,不平齐;在混凝土楼板内敷设的管路保护层厚度大于15mm,以免出现楼板裂纹;不进行扫管穿带线,造成管路被堵现象;管子入盒时,不进行固定,不带护线帽;(5)配电箱的安装问题
暗装配电箱箱体贴脸没有紧贴墙面,留有空隙;箱体与预留洞的间隙及箱体背面安装时没用豆石混凝土封堵,造成侧面空鼓,背面墙面裂纹;安装过程中没有按系统图对配电箱回路进行一次编号、进入箱体的管线布置杂乱无序、交叉;箱盘后导线没有进行绑扎固定,配线不整齐;采用多股线没有采取搪锡或压接措施;管线进箱开孔与钢管规格不匹配,或用电、气焊割孔使开孔质量不好等。
(6)建筑防雷接地系统安装问题建筑物避雷带按规范要求必须采用镀锌圆钢。避雷带与引下线、引下线的连接、接地体的引出线的焊接的质量差,扁钢搭接小于宽度的2倍,圆钢小于直径的6倍,焊接不饱满,焊接处有夹渣、咬肉,没有敲掉焊渣等缺陷,镀锌焊接破坏层不刷防锈漆;接地线、接闪器跨越建筑物变形缝处时,未加设补偿器,穿墙体时未加保护管;屋面金属物,如管道、梯子和设备外壳等,未与屋顶接闪器相连;接地体安装埋设深度不够等。
二、建筑水电安装施工的技术问题的预防整治措施(1)给排水管道的渗漏与堵塞问题的预防整治
首先必须审核施工图纸上的设计给排水管道的坡度和建筑物整体结构的最大沉降量是否存在矛盾,如有矛盾可及时提请相关设计单位予以解决。现场施工导致管道放置坡度出现不均匀的情况,现场监理应勒令调整,不准倒坡。为避免安装给排水管道出现渗漏与堵塞问题的出现,应从管材、配件等采购质量把关做起。对于管材等物资采购的把关应注意其物资的出厂质量合格保证书,须通过试验室的现场检验然后进入现场。需要特别强调的是,镀锌管材不能采用焊接的手段进行连接且管材配件不得随意替换。卫生间管道配件之间的连接对口必须密实均匀且表面平整滑顺。
给排水管道初期安装完成后,通常可以采用专用的橡皮塞堵严管道开口,以防止垃圾物体掉入开口管道。安装管道的施工过程中应在放置管道前彻底清理管内杂物,先后通过对管道进行通水、通球试验,以保证管道畅通不留后患。如遇到管道堵塞情况,及时查明堵塞位置进行疏通工作,工作失败则立即作返工处理。
(2)电气安装工程配构件安装施工问题的预防整治
电气安装工程必须注意接地线的组织安装,管线配电采用丝扣连接时必须做好跨接地线,跨接接地严禁采用对焊的方式进行焊接,同时不得将地线焊接到金属配电箱的外壳。接地线的敷设必须独立作业,不得与其他导线相互混同。建筑物避雷带的连接装置须严禁采用直接对焊,焊接工作需要由专业的焊工操作作业,連接体焊接表面要保证平整滑顺,不虚焊,及时处理焊接部分的夹渣、药渣等。施工过程中强调标志出避雷带部位,以避免建筑物主体钢筋与避雷带混同,造成两者搭接短路,保证施工安全和电气安装工程的质量。
三、结束语
建筑工程施工是一项复杂且具有多重矛盾的工作,要想工程施工质量得到保证,仅仅通过对本专业的管理是不够的。对于建筑工程要具有一定的全局观,综合考虑不同方面、不同环节的有关因素解决相关专业的问题。针对建筑工程水电安装的施工质量问题,虽然国家和有关管理部门都有制定相关的规范标准,但是建筑企业忽视了对现场施工管理的落实工作的力度也会成为出现施工质量问题的主导原因。因此,对建筑工程水电安装施工的控制管理要从基本的设计施工图纸审核、物资采购的质量把关以及现场施工的组织安排等方面加强,才能避免更多的质量问题的出现。
参考文献
[1] 王兴斌;建筑水电安装工程技术管理的几点意见[J];施工技术;2009,(15):129 - 147
[2] 李明华;高层建筑装饰中水电安装质量存在的问题[J];福建建筑;2007,(5):63 - 64
[3] 叶龙海;浅谈水电安装与土建配合中质量通病的防治[J];福建建设科技;2004,(3):244 – 145
Abstract: Along with high-speed development of our national economy, the living building environmental quality requirements gradually increase, the construction of hydropower installation quality is improved. However, in the water and electricity installation process always meet some for pre-control measures do not to reach the designated position caused by quality problems in construction of. This article mainly aims at the construction of hydropower installation of these technical problems put forward the individual's opinion, and make a preliminary analysis and Discussion on its relevant problems, at the same time the prevention measures for further summarized, facilitating peer friends share learning
关键词:建筑水电、安装工程、技术问题、预防措施
中图分类号:TM05 文献标识码:A 文章编号:
Key Words: construction of hydropower installation engineering, technology, problems, preventive measures
水电安装是建筑安装工程的重要组成部分。水电安装施工质量的好坏直接影响整体建筑工程的使用质量。虽然国家和地方有关部门都对水电安装工程的施工质量制定了一系列的规范标准,但是很多的施工企业在具体的施工过程中还是存在诸多违背规范的做法,导致其安装质量出现很多问题。目前,我国建筑安装工程施工出现的质量通病主要包括给排水工程的渗漏和堵塞情况、电气安装的漏电和短路情况等。
建筑工程水电安装施工技术的问题分析
(1)给排水管道的安装问题
建筑工程给排水施工过程中,对于每条管道布置位置要合理,按照施工方案有序作业,才能够保证给排水管道安装施工的质量。给排水管道安装施工主要出现的通病有:管材质量问题诸如管壁太薄、管径不足、镀锌厚度不足等问题;安装排水横管出现倒坡现象; PVC-U管壁污秽情况严重、伸缩节设置位置存在偏差、穿楼板处存在漏渗情况;管道阀门安装启闭装置不够灵活;建筑屋面水箱预埋防水套管制作工艺不规范导致制品不符合标准、预埋管道的坡度拿捏不准等。
(2)室内卫生间器具的安装问题
卫生间内部空间的器具及配件的安装未按照设计施工图纸的标准尺寸进行安装作业,选取的卫生器具及系统配件的材质不良等情况都是造成给排水工程后续使用问题的原因。
(3)建筑清扫口、检查口和地漏等关键部位的施工问题
清扫口、检查口和地漏等建筑水电安装关键部位的施工问题主要发生原因在于检查口位置设置不够合理、清扫口距离墙面不符合规范要求的净距离、地漏未设置安装水封装置及地漏安装标高不合理等情况。
(4)电气工程的管线预埋与敷设问题
建筑电气工程的管线敷设问题也是一直困扰建筑工程施工的一方面内容。管线预埋与敷设施工存在的问题多由于其管材的选择和连接所造成。例如绝缘导管连接套管直径选择不合适,过大,造成连接处粘接不严密牢固;管材管壁厚度不足,使导管弯曲处出现弯扁现象;管口在盒内长短不一,不平齐;在混凝土楼板内敷设的管路保护层厚度大于15mm,以免出现楼板裂纹;不进行扫管穿带线,造成管路被堵现象;管子入盒时,不进行固定,不带护线帽;(5)配电箱的安装问题
暗装配电箱箱体贴脸没有紧贴墙面,留有空隙;箱体与预留洞的间隙及箱体背面安装时没用豆石混凝土封堵,造成侧面空鼓,背面墙面裂纹;安装过程中没有按系统图对配电箱回路进行一次编号、进入箱体的管线布置杂乱无序、交叉;箱盘后导线没有进行绑扎固定,配线不整齐;采用多股线没有采取搪锡或压接措施;管线进箱开孔与钢管规格不匹配,或用电、气焊割孔使开孔质量不好等。
(6)建筑防雷接地系统安装问题建筑物避雷带按规范要求必须采用镀锌圆钢。避雷带与引下线、引下线的连接、接地体的引出线的焊接的质量差,扁钢搭接小于宽度的2倍,圆钢小于直径的6倍,焊接不饱满,焊接处有夹渣、咬肉,没有敲掉焊渣等缺陷,镀锌焊接破坏层不刷防锈漆;接地线、接闪器跨越建筑物变形缝处时,未加设补偿器,穿墙体时未加保护管;屋面金属物,如管道、梯子和设备外壳等,未与屋顶接闪器相连;接地体安装埋设深度不够等。
二、建筑水电安装施工的技术问题的预防整治措施(1)给排水管道的渗漏与堵塞问题的预防整治
首先必须审核施工图纸上的设计给排水管道的坡度和建筑物整体结构的最大沉降量是否存在矛盾,如有矛盾可及时提请相关设计单位予以解决。现场施工导致管道放置坡度出现不均匀的情况,现场监理应勒令调整,不准倒坡。为避免安装给排水管道出现渗漏与堵塞问题的出现,应从管材、配件等采购质量把关做起。对于管材等物资采购的把关应注意其物资的出厂质量合格保证书,须通过试验室的现场检验然后进入现场。需要特别强调的是,镀锌管材不能采用焊接的手段进行连接且管材配件不得随意替换。卫生间管道配件之间的连接对口必须密实均匀且表面平整滑顺。
给排水管道初期安装完成后,通常可以采用专用的橡皮塞堵严管道开口,以防止垃圾物体掉入开口管道。安装管道的施工过程中应在放置管道前彻底清理管内杂物,先后通过对管道进行通水、通球试验,以保证管道畅通不留后患。如遇到管道堵塞情况,及时查明堵塞位置进行疏通工作,工作失败则立即作返工处理。
(2)电气安装工程配构件安装施工问题的预防整治
电气安装工程必须注意接地线的组织安装,管线配电采用丝扣连接时必须做好跨接地线,跨接接地严禁采用对焊的方式进行焊接,同时不得将地线焊接到金属配电箱的外壳。接地线的敷设必须独立作业,不得与其他导线相互混同。建筑物避雷带的连接装置须严禁采用直接对焊,焊接工作需要由专业的焊工操作作业,連接体焊接表面要保证平整滑顺,不虚焊,及时处理焊接部分的夹渣、药渣等。施工过程中强调标志出避雷带部位,以避免建筑物主体钢筋与避雷带混同,造成两者搭接短路,保证施工安全和电气安装工程的质量。
三、结束语
建筑工程施工是一项复杂且具有多重矛盾的工作,要想工程施工质量得到保证,仅仅通过对本专业的管理是不够的。对于建筑工程要具有一定的全局观,综合考虑不同方面、不同环节的有关因素解决相关专业的问题。针对建筑工程水电安装的施工质量问题,虽然国家和有关管理部门都有制定相关的规范标准,但是建筑企业忽视了对现场施工管理的落实工作的力度也会成为出现施工质量问题的主导原因。因此,对建筑工程水电安装施工的控制管理要从基本的设计施工图纸审核、物资采购的质量把关以及现场施工的组织安排等方面加强,才能避免更多的质量问题的出现。