目前,现行的公路施工项目管理模式还存在一些不足之处,在进度计划管理方面做得尤其不够,还处于横道图计划水平,在保证工程质量的基础上合理地制定优化施工计划等等,所有这些不足亟待解决。首先介绍公路项目施工中进度控制的内容,然后详细探讨施工中进度保证的相关措施。
At present, there are still some shortcomings in the current highway construction project management mode. In particular, the progress plan management has not done enough. It is still on the level of the plan of the cross-track plan. The construction plan of the optimized construction plan is reasonably formulated on the basis of ensuring the project quality. These problems need to be solved urgently. First of all, the paper introduces the content of schedule control in the construction of highway project, and then discusses in detail the relevant measures of progress assurance in construction.