经过十余年的建设,辽宁省初步建成野外监测站(点)20处,纳入到水土保持监测网络的水文站10个,监测专职人员100余名,现有监测站(点)建成后均已开展水土保持监测工作;同时,辽宁省已对全省进行4次水土流失遥感普查。但是,目前尚存在水土保持监测工作开展时间较短,监测站(点)布局不够合理,监测人员技术水平有待提高,部分监测设备、设施存在问题影响监测精度等问题。因此,根据国家有关会议精神和辽宁省实际情况,对未来全省水土保持监测工作进行了探讨,为其长远发展提供了思路,同时也为政府宏观决策提供参考。
After more than ten years of construction, Liaoning Province has initially completed 20 field monitoring stations (points), including 10 hydrological stations in soil and water conservation monitoring network and more than 100 full-time monitoring staff. All existing monitoring stations (spots) have been completed Carry out soil and water conservation monitoring work; the same time, Liaoning Province has carried out four remote sensing survey of soil erosion in the province. However, there are still some problems such as the short time of soil and water conservation monitoring, the inadequate layout of monitoring stations (points), the need of improving the technical level of monitoring personnel, and the monitoring accuracy of some monitoring equipment and facilities. Therefore, according to the spirit of the state conference and the actual situation in Liaoning Province, the monitoring work of soil and water conservation in the whole province was discussed in the future, providing ideas for its long-term development and providing a reference for the government’s macro decision-making.