摘要:建设工程项目成本控制应贯穿于工程从招标阶段到竣工验收全过程,它是企业全面预算及成本管理的重要环节。建筑成本控制分为事前控制,事中控制和事后控制。而事前控制主要体现在图纸设计阶段的造价控制。长期以来,我国普遍忽视工程建设项目的前期控制,控制的重点都是放在工程的施工过程和结算阶段。其实想有效的控制成本,应该未雨绸缪,一定要抓住设计阶段造价的控制。
关键词:工业厂房; 设计时期; 工程造价
Abstract: the construction project cost control should run through the engineering bidding stage to the completion acceptance from the whole process, it is a comprehensive enterprise budget and cost management important segment. The construction cost control can be divided into beforehand control, course control and afterwards controls. And beforehand control mainly reflects in drawing design phase of the cost control. Long-term since, our country generally ignored engineering construction the early stages of the project control, the control of the focus has been on engineering construction process and settlement stage. Actually want to effective cost control, should prepare for a rainy day, we must focus on the design phase of the cost control.
Keywords: industrial workshop; Design period; Project cost
中图分类号:TU723.3文献标识码:A 文章编号:
工业厂房工程造价在设计阶段的控制是一个包含着多层次工程造价的体系,一般是工程项目投资金额越大,生产和使用周期越长。工业厂房建筑是集经济、技术与管理为一体的综合实体,工程造价的高低,直接影响着企业投资建厂房的成本高低。而且厂房建设是一次性投入,需要较长时间才能回收回投入的成本,并且厂房在使用过程中还需要一定维修费用。我国在土建工程造价管理存在着“三超”现象相当普遍,建设工程周期长、消耗量大,不但受科学技术条件的限制,而且受客观过程的发展及其表现程度的限制,常常出现概算超估算、预算超概算、决算超预算的问题,通常称为“三超”现象。
另外大家也了解下工业厂房设计的概念,工业厂房设计,是指设计单位在接受委托方(企业)设计任务书后,按照委托方规定的工艺流程、预投产规模要求和内容、厂房投产时间进行设计。设计阶段对工程项目投资起着决定性的作用。那么如何合理确定和有效地控制建设厂房的工程造价,是目前急待进一步解决的课题,下面我们就初步详细的探讨下怎样有效的控制厂房的造价。
首先,建筑工程勘探工作是建筑工程设计的基础,是指导建筑工程实际施工的科学保障。在企业投资建设的前期,就应该通过加强建筑工程的勘探工作、强化勘探的科学性来提高成本控制的质量,为工程设计奠定基础。我接触过一些企业,为了节省开支,不进行地质勘探工作,而是根据相邻厂房的旧地质报告,这样是很不科学的。
而且工业企业在选择生产工艺方案时,应从本企业的实际情况出发,以提高投资效益为前提,积极而妥当地采用先进的技术方案和成熟的新技术。一般来说,先进的工艺方案劳动生产效率高,质量好,但是所需的投资较大。因此,要认真进行经济分析,根据我国国情和本企业的经济实力还有产品的市场形势,确定先进、适用、经济、合理、切实可行的工艺技术方案。
其次,委托方要多和设计单位多沟通。使设计人员精确的了解企业的需求,了解建筑工程内部各个部分的比重,同时还能充分考虑与吸收各个方面的意见与建议,实现设计的科学性和可实施性。
最后在初步图纸设计出来后,委托方(企业)中的施工人员与造价人员就可以初步审定下图纸的合理性和经济性,避免进行到深层设计后发现先天不足造成图纸大的改动,给双方都带来麻烦。施工过程如果发现不合理,势必增加造价,而且还影响工期,可谓双输。
根据现阶段,我国大型工业厂房多为钢筋混凝土结构,对于钢筋混凝土结构的厂房,在设计初期阶段就该严格控制钢筋含量,各种结构构件比如梁,板,柱的形式和截面面积,尤其是截面大小的选择上,应该做到反复推敲,在保证承载力的前提下,节省混凝土和钢筋的用量。对于这个方面,房地产开发公司近年来在设计阶段对住宅钢筋含量可谓是精打细算,甚至于给设计院提出来我们开发的住宅每平米钢筋含量为多少……其实在厂房设计上也可以借鉴。钢筋的选用上也可以参照别的城市成熟经验,别动辄就使用三级钢,沈阳早在2006年就推行冷轧带肋钢筋,冷轧带肋钢筋与热轧光圆钢筋相比,用于现浇结构(特别是楼屋盖中)可节约30%的钢材经济实用。
在模板选择上,我认为钢木模板比较合理,比较经济,在材料周转上也比较迅速,造价也不高。没有必要全部使用木模板,木模板随着木材全球范围原料的减少,价格不断上涨,并不经济。
我认为在设计阶段影响工程造价的因素有:
设计前期准备不充分,设计基础资料不全,又急于投产,使可行性报告深度不够,概算阶段就缺少必要的设计依据,造成投资先天性不足。
设计图纸完成后,交付给企业,企业不组织技术人员审核,甚至于不做图纸交底,着急招标就施工,一些问题在施工过程才暴露出来,造成整体造价增加。
针对这个谈谈如何有效控制工程造价的措施
在设计阶段,就要促使工程造价人员和设计人员密切沟通和配合。要求设计单位加强经济观念。其次要扭转在设计过程中设计过于保守,造成材料浪费,直接造成工程造价增加。
加强对设计变更的管理,避免不合理的设计,避免在施工中发现各种不合理的现象,边施工边修改,这样造成无法预测工程造价如何控制。
企业高层和中层管理人员重视设计阶段的控制,基层工程人员主要是工程经济人员有较高的业务水平,在设计初步图纸到达工程部门的时候,就可以尽早控制整个厂房的成本。
先列举一个设计阶段控制得当的实例,我企业准备建设一个大型钢结构厂房,开始概算阶段采用的是双层复合彩板墙体,在讨论设计方案时候,有专业人士提出此厂房职工较少,机器设备较多,另外厂房内机器也散热,没有必要必须用双层彩板,于是改成了单层彩板墙体,节省了16.5万元材料费,间接的人工费也会减少。在设计阶段成功的控制了造价。
然后列举说一个设计阶段失败的实例,某个企业上马一个环保项目,需要新建一个小型厂房。当时由于工艺方案设计的尺寸不合理,造成土建预留地坑过小,施工完毕后,很多设备安装不上。没有办法投产,于是召开专题会议,重新设计了建筑图纸,把刚施工好厂房的拆掉一部分,以便生产。改造的时间大约为1个月,造价为15万元。对企业生产体系整体造成了极坏的影响。
总之,设计时期的造价看似简单,其实也不简单,整个控制过程也是一个复杂的系统工程。但是它不是深不可测,只要我们充分认识到在设计时期的造价控制是关键。设计阶段控制造价是花小钱办大事,如果做好的话,才是真正意义上的控制造价。只要我们各负其责,做到认真二字,一切都变的那么简单。
参考文献:
[1]《建设工程项目管理》中国建筑工业出版社.
[2]曲榮.浅谈设计阶段的投资控制《建筑与预算》2008.2.
作者简介:于松岩,(1978.10--),女,大学本科学历,建筑工程系。现就职于辽宁锦州集信实业有限公司监察审计部。2001年毕业后在设计院从事设计工作,2004年起在大型工业企业从事造价工作到至今。对建筑、装饰、市政工程造价有较高的计算和审核水平。论文在本企业获过科技论文二等奖。
关键词:工业厂房; 设计时期; 工程造价
Abstract: the construction project cost control should run through the engineering bidding stage to the completion acceptance from the whole process, it is a comprehensive enterprise budget and cost management important segment. The construction cost control can be divided into beforehand control, course control and afterwards controls. And beforehand control mainly reflects in drawing design phase of the cost control. Long-term since, our country generally ignored engineering construction the early stages of the project control, the control of the focus has been on engineering construction process and settlement stage. Actually want to effective cost control, should prepare for a rainy day, we must focus on the design phase of the cost control.
Keywords: industrial workshop; Design period; Project cost
中图分类号:TU723.3文献标识码:A 文章编号:
工业厂房工程造价在设计阶段的控制是一个包含着多层次工程造价的体系,一般是工程项目投资金额越大,生产和使用周期越长。工业厂房建筑是集经济、技术与管理为一体的综合实体,工程造价的高低,直接影响着企业投资建厂房的成本高低。而且厂房建设是一次性投入,需要较长时间才能回收回投入的成本,并且厂房在使用过程中还需要一定维修费用。我国在土建工程造价管理存在着“三超”现象相当普遍,建设工程周期长、消耗量大,不但受科学技术条件的限制,而且受客观过程的发展及其表现程度的限制,常常出现概算超估算、预算超概算、决算超预算的问题,通常称为“三超”现象。
另外大家也了解下工业厂房设计的概念,工业厂房设计,是指设计单位在接受委托方(企业)设计任务书后,按照委托方规定的工艺流程、预投产规模要求和内容、厂房投产时间进行设计。设计阶段对工程项目投资起着决定性的作用。那么如何合理确定和有效地控制建设厂房的工程造价,是目前急待进一步解决的课题,下面我们就初步详细的探讨下怎样有效的控制厂房的造价。
首先,建筑工程勘探工作是建筑工程设计的基础,是指导建筑工程实际施工的科学保障。在企业投资建设的前期,就应该通过加强建筑工程的勘探工作、强化勘探的科学性来提高成本控制的质量,为工程设计奠定基础。我接触过一些企业,为了节省开支,不进行地质勘探工作,而是根据相邻厂房的旧地质报告,这样是很不科学的。
而且工业企业在选择生产工艺方案时,应从本企业的实际情况出发,以提高投资效益为前提,积极而妥当地采用先进的技术方案和成熟的新技术。一般来说,先进的工艺方案劳动生产效率高,质量好,但是所需的投资较大。因此,要认真进行经济分析,根据我国国情和本企业的经济实力还有产品的市场形势,确定先进、适用、经济、合理、切实可行的工艺技术方案。
其次,委托方要多和设计单位多沟通。使设计人员精确的了解企业的需求,了解建筑工程内部各个部分的比重,同时还能充分考虑与吸收各个方面的意见与建议,实现设计的科学性和可实施性。
最后在初步图纸设计出来后,委托方(企业)中的施工人员与造价人员就可以初步审定下图纸的合理性和经济性,避免进行到深层设计后发现先天不足造成图纸大的改动,给双方都带来麻烦。施工过程如果发现不合理,势必增加造价,而且还影响工期,可谓双输。
根据现阶段,我国大型工业厂房多为钢筋混凝土结构,对于钢筋混凝土结构的厂房,在设计初期阶段就该严格控制钢筋含量,各种结构构件比如梁,板,柱的形式和截面面积,尤其是截面大小的选择上,应该做到反复推敲,在保证承载力的前提下,节省混凝土和钢筋的用量。对于这个方面,房地产开发公司近年来在设计阶段对住宅钢筋含量可谓是精打细算,甚至于给设计院提出来我们开发的住宅每平米钢筋含量为多少……其实在厂房设计上也可以借鉴。钢筋的选用上也可以参照别的城市成熟经验,别动辄就使用三级钢,沈阳早在2006年就推行冷轧带肋钢筋,冷轧带肋钢筋与热轧光圆钢筋相比,用于现浇结构(特别是楼屋盖中)可节约30%的钢材经济实用。
在模板选择上,我认为钢木模板比较合理,比较经济,在材料周转上也比较迅速,造价也不高。没有必要全部使用木模板,木模板随着木材全球范围原料的减少,价格不断上涨,并不经济。
我认为在设计阶段影响工程造价的因素有:
设计前期准备不充分,设计基础资料不全,又急于投产,使可行性报告深度不够,概算阶段就缺少必要的设计依据,造成投资先天性不足。
设计图纸完成后,交付给企业,企业不组织技术人员审核,甚至于不做图纸交底,着急招标就施工,一些问题在施工过程才暴露出来,造成整体造价增加。
针对这个谈谈如何有效控制工程造价的措施
在设计阶段,就要促使工程造价人员和设计人员密切沟通和配合。要求设计单位加强经济观念。其次要扭转在设计过程中设计过于保守,造成材料浪费,直接造成工程造价增加。
加强对设计变更的管理,避免不合理的设计,避免在施工中发现各种不合理的现象,边施工边修改,这样造成无法预测工程造价如何控制。
企业高层和中层管理人员重视设计阶段的控制,基层工程人员主要是工程经济人员有较高的业务水平,在设计初步图纸到达工程部门的时候,就可以尽早控制整个厂房的成本。
先列举一个设计阶段控制得当的实例,我企业准备建设一个大型钢结构厂房,开始概算阶段采用的是双层复合彩板墙体,在讨论设计方案时候,有专业人士提出此厂房职工较少,机器设备较多,另外厂房内机器也散热,没有必要必须用双层彩板,于是改成了单层彩板墙体,节省了16.5万元材料费,间接的人工费也会减少。在设计阶段成功的控制了造价。
然后列举说一个设计阶段失败的实例,某个企业上马一个环保项目,需要新建一个小型厂房。当时由于工艺方案设计的尺寸不合理,造成土建预留地坑过小,施工完毕后,很多设备安装不上。没有办法投产,于是召开专题会议,重新设计了建筑图纸,把刚施工好厂房的拆掉一部分,以便生产。改造的时间大约为1个月,造价为15万元。对企业生产体系整体造成了极坏的影响。
总之,设计时期的造价看似简单,其实也不简单,整个控制过程也是一个复杂的系统工程。但是它不是深不可测,只要我们充分认识到在设计时期的造价控制是关键。设计阶段控制造价是花小钱办大事,如果做好的话,才是真正意义上的控制造价。只要我们各负其责,做到认真二字,一切都变的那么简单。