35千伏小型变电站设备构架的简化

来源 :水电机电安装技术 | 被引量 : 0次 | 上传用户:alanlee75
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着小水电事业的发展,在兴建小水电站的同时,农村及城镇电压等级为35千伏的小型变电站也日趋增多。在设计中,经常会遇到35千伏小型变电站屋外配电装置设备支架、构架及环形柱(立柱)的选用问题。按以往惯例,一般采用定型设计标准图,在现场浇注制作。贵州天生桥电站升压站装有二台SJL_1-3150KVA、35KV/6.3KV的主变压器,经26公里输电线路,利用城关变电站二台SJ With the development of small hydropower, the construction of small hydropower stations at the same time, rural and urban small voltage 35kV substations are also increasing. In the design, we often encounter 35 kV small substation outdoor power distribution equipment, equipment frame, frame and ring column (column) selection problem. According to past practice, the general use of stereotypes design standard diagram, pouring in the field production. Guizhou Tianshengqiao station booster station equipped with two SJL_1-3150KVA, 35KV / 6.3KV of the main transformer, the transmission line through the 26 km, the use of Chengguan substation two SJ
其他文献
珠委根据水利部下达的任务,促进珠江流域及东南沿海片诸省(区)水利化区划和水资源调查评价的协调汇总工作,于八月二十二至二十八日,在广州开了“珠江流域及东南沿海水利化区
翻译教学不应该仅仅停留在翻译方法或技巧的讲解中,而应该结合学生层次培养学生发现并总结某个翻译现象,思考该现象的形成原因,并尝试做出发现问题、总结问题、解决问题的思
重力坝静力计算概念坝体上游防渗层及其下游水势多用沉陷缝与溢流重力坝隔开,所以后者的静力计算应单独进行。在这种情形中,对混凝土坝体,施着最后的下列力量(参看图一):形
我校是应用型本科院校,对于汉语言文学这一传统专业的教学,应当在“知识中心”的基础上,加强对“能力中心”的重视,注重培养学生的专业素养和能力。我们可以以实训教学作为突
一、激发极化法找水的基本原理电阻率法找水是通过电极往大地供电,根据不同岩层电阻率的差异,判别含水层,达到寻找地下水的目的. 激发极化法是利用二次场电位差衰减特性,判
清华大学水利系黄万里教授应四川水利学会和四川省水力发电工程学会的邀请(籍黄教授来川开会之便),于七月中旬在成都讲学。黄教授虽年逾七旬,仍不顾年迈体弱,旅途劳累,欣然应
应用水文预报进行水库洪水调度,能提高水库的防洪效益。而一般的水库洪水预报方法,由于工序繁多,操作费时,不利于水库及时预泄。本方案从流域洪水规律出发,制作一套相关图,
Angiostatin是一种新发现的对肿瘤生长有特异抑制作用的抗血管生成因子,实验已证实其对多种肿瘤有明显的抑制作用。本文报告构建了含Angiostatin基因的真核表达载体pAG3,通过
一、概述汉江下游河槽泄洪能力不平衡(上大下小),并受汉口长江高水顶托的影响。为避免下游经常发生洪水灾害,1956年在汉江下游修建了杜家台分洪工程。洪水经分洪闸、分洪道
本人在《水电机电安装技术》78年第一期上提出了“水轮发电机组安装基准中心的改造意见”一文。刘家峡发电厂的胡金荣同志对这个方法作了理论上的充实和提高。本文是要说明