论文部分内容阅读
混凝土施工是核电站土建施工技术的关键,必须对其可能产生的裂缝进行有效地控制。本文结合巴基斯坦恰希玛核电站二期工程阐述了在高温低湿的恶劣环境下采取的混凝土裂缝主要控制措施,为类似的核电站工程提供借鉴。
Concrete construction is the key of civil engineering construction technology of nuclear power plant. It is necessary to control its possible cracks effectively. In this paper, the main control measures of concrete cracks taken in harsh environment of high temperature and low humidity are expounded in the second phase project of Pakistan Chashma Nuclear Power Station, which can provide references for similar nuclear power station projects.