近几年,随着国家铁路建设的不断发展,隧道施工越来越多,隧道施工过程中的超前地质预报就担当起了越来越重要的角色,但是在实际测量和数据处理过程中暴露出了越来越多的问题,本文重点对目前国内应用较多的一种超前地质预报技术TSP(tunnel seismic prediction system)的数据处理过程中的几个重点参数进行分析,为数据准确处理和施工指导提供参考。
In recent years, with the continuous development of the national railway construction, more and more tunnels are being constructed and the advanced geological forecasting in tunnel construction plays an increasingly important role. However, during the actual measurement and data processing, More and more problems, this paper focuses on the current application of a more advanced geological prediction technology TSP (tunnel seismic prediction system) in the data processing of several key parameters for the analysis of data processing and construction guidance for reference.