论文部分内容阅读
采用“最高用水量法”对农村供水工程中的树枝状配水管网进行水力计算。简化了计算程序。此法曾应用于武威市农村饮水解困工程项目、农村饮水安全项目多座农村水厂的设计和技术审批。应用表明,用“最高用水量法”进行水力计算所建的农村水厂配水管网运行效果与设计相符,能有效地控制和把握建设农村水厂的技术经济指标,是农村树枝状供水管网水力计算的简捷方法。
Adopting the “maximum water consumption method” for hydraulic calculation of dendritic distribution network in rural water supply project. Simplify the calculation process. This method has been used in rural drinking water project in Wuwei City, rural drinking water safety project a number of rural water plant design and technical approval. The application shows that the operation effect of water distribution network in rural waterworks constructed by hydraulic calculation with “maximum water consumption method” is consistent with the design and can effectively control and grasp the technical and economic indicators for building rural waterworks. It is a rural branch water supply network A quick and easy method of hydraulic calculation.