论文部分内容阅读
大同市南郊区峰子涧和尚咀煤矿,有300多名职工,54名管理人员。在矿长杜文的领导下,全矿人员开拓进取,发奋图强,创造了喜人的经济效益,2003年上交税金300万元,2004年上半年已上交国地两税180万元。该矿设计能力为年产21万吨煤炭,实际年产18到19万吨。杜文矿长为了提高生产能力,保证安全生产,加强技术设备改造,先后投资500余万元,改善了井下通风系统,诸如从“一通三防”通风到改造主扇75风机为110风机;又如生产系统主副道,新上皮带输送设备,购买开关、瓦斯探头等等,大大改善了煤矿生产条件,为提高经济效益奠定了物质基础。杜文矿长认为煤矿生产技术条件改善之后,提高人的素质至关重要。因此注重
Datong City, the southern suburb of peak stream monk Tsui Coal Mine, more than 300 workers, 54 managers. Under the leadership of Du Wen, head of the mine, all the mine staffs pioneered and worked hard to create gratifying economic benefits. In 2003, they handed in a tax tax of 3 million yuan and handed over 1.8 million yuan of domestic taxes and two taxes in the first half of 2004. The design capacity of the mine is an annual output of 210,000 tons of coal, the actual annual output of 18 to 190,000 tons. In order to improve production capacity, ensure safety in production and strengthen the transformation of technical equipment, Du Wenzhang invested more than 5 million yuan successively to improve the underground ventilation system, such as ventilation from the “one ventilation and three preventions” to the modification of the main fan 75 to 110 fans; and Such as the production system, the main road, the new belt conveyor equipment, the purchase of switches, gas probes, etc., greatly improving the conditions for the production of coal in order to improve the economic benefits and laid a material foundation. Du Wen miners believe that improving the technical conditions of coal production, improve people’s quality is essential. So pay attention