斜拉桥钢箱梁悬拼合龙施工测量

来源 :公路 | 被引量 : 0次 | 上传用户:worbestczhy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
根据鸭绿江界河斜拉桥项目施工和测量控制网布制特点,建立了钢箱梁悬拼合龙控制基点。论述了基点设置以及施工测量方法,通过斜拉桥悬拼安装过程中测量控制,在该项目施工测中引入了CAD三维建模测量技术,质量检验数据全部满足规范要求,顺利完成主桥主跨合龙,最终胜利完成1 266 m双塔双索面钢箱梁斜拉桥五跨连续半飘浮体系。 According to the Yalu River boundary river cable-stayed bridge project construction and measurement control network cloth system features, the steel box girder suspended fight dragon base point control. The basic point setting and construction measuring method are discussed. Through the measurement and control during the installation of suspended cable-stayed bridge, CAD three-dimensional modeling and measuring technology is introduced into the construction survey. The quality inspection data all meet the requirements of the specification and the main span Closure, the final victory 1 266 m double tower double cable plane box girder cable-stayed bridge five-span continuous semi-floating system.
其他文献
电力系统发生故障时,由于线路电感的存在,故障暂态信号中将含有大量的衰减直流分量,该直流分量刚好可以用于故障选相。选用京津唐500 kV输电线路的实际参数,建立EMTP/ATP系统
“回家执教有压力,但更是一种挑战,我不喜欢一份非常安逸的工作,这会让我感到消沉。我希望通过努力,为家乡球队做点什么,毕竟我是大连人。这么多年,在大连工作时间很短,这次
12月10日召开的华东电网2011年基建会议确立2012年与“十二五”基建总体目标,即率先实现“在国际上同行业中领先、在国内领先”工程建设质量和工艺目标;率先实现消除较大及以
屏栅电离室是一种测量带电粒子的常用探测器。本工作利用蒙特卡罗模拟计算方法,理论计算不同能量的α粒子在电离室不同填充气体条件下的能损分布及电子-离子对数,优化选择合
129I是一半衰期较长的放射性核素,是核电站中的裂变产物,对于监控核电站安全运行有重要意义。环境样品中的129I同位素为痕量。目前,加速器质谱技术(AMS)是实现129I高灵敏测量
首先尝试基于Google Earth地图系统提供的地形数据,利用逆向网格生成技术,获得了满足桥位地形风环境模拟的一定范围的地形模型;基于数值风洞模拟技术,进行了桥位自然主导风向
期刊
@@
阐述了江苏省电力公司在构建适应电网发展要求的纵向省、地、县一体化的调度操作管理标准体系过程中解决的问题。介绍了该标准体系建设阶段的主要工作任务,并对调度操作标准
G105国道(珠海段)快速化改造工程主线采用高架桥方案,主线桥双向6车道,桥宽27.5m,跨径为30~35m,因下部桥墩可布置空间较小,桥梁采用整体式大悬臂预应力混凝土连续箱梁。设计采
小沙湾黄河特大桥是一座主跨440 m的混凝土主梁斜拉桥,由于东西侧索塔高低差别大,桥梁在结构震型上具有一定的特殊性,设计者通过不断地调整阻尼器阻尼参数,最终使高低塔都达
期刊
@@
一日本资本主义的形成与确立——从明治维新到第一次世界大战明治维新的评价与“近代”的概念长期以来,历史研究者对明治维新及其后的近代日本社会的历史性质存在着对立的观