论文部分内容阅读
由浙江能源集团投资建设的阿克苏纺织工业城热电厂2×35万千瓦项目日前获得国家能源局批复。该项目总投资30亿元,拟建设2×350MW超临界燃煤直接空冷抽凝机组,具备700吨/时供气能力和400万平方米供暖能力,同步安装烟气脱硫装置、脱硝装置,其热效率、热电比高,单位煤耗低,耗水量小,可有效利用能源,符合国家产业政策,符合循环经济的战略方针,具有较好的环保效益和社会经济效益,有利于南疆地区水电和火电形成资源优势
The 2 × 350MW project of Aksu Textile Industrial City Thermal Power Plant invested and constructed by Zhejiang Energy Group has been approved by the National Energy Administration recently. The total investment of this project is 3 billion Yuan, and it is planned to build 2 × 350MW supercritical coal-fired direct air-cooling condensing unit with 700 tons / hour gas supply capacity and 4 million square meters heating capacity. Simultaneously install flue gas desulfurization and denitrification devices Thermal efficiency, high thermoelectricity ratio, unit coal consumption is low, water consumption is small, can effectively use energy, in line with national industrial policy, in line with the strategic circular economy, has good environmental benefits and social and economic benefits, is conducive to the southern region of hydropower and thermal power Form a resource advantage