项目前期立项及方案优化的程序与方法探讨

来源 :工程技术研究 | 被引量 : 0次 | 上传用户:zzt00007
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
狭义的项目前期工作是指办理项目建设的合法程序,有些项目还包括建成运行时水、电、燃气、通信等生活必需品申请开通的手续办理。文章主要研究狭义的项目前期立项工作。对于一个工程项目来说,项目的前期工作对工程建设起着决定性的作用,项目的设计、规模大小、工程造价都是在前期工作中首先作出策划及概算,技术施工阶段紧紧围绕前期工作来细化设计,并根据设计施工图纸来施工,控制工程总造价。 The narrow pre-project work refers to the legal procedures for project construction. Some projects also include formalities for applying for the opening up of necessities such as water, electricity, gas and communications during operation. The article mainly studies the narrow project preliminary project work. For a project, the preliminary work of the project plays a decisive role in the project construction. The design, size and cost of the project are the first to make planning and budget estimates in the previous work. The technical construction phase closely follows the previous work Refine the design, and construction drawings based on the construction to control the total cost of the project.
其他文献
通过5年多的“温室黄瓜有机生态型无土栽培技术”生产实践,初步掌握并总结出了该栽培方式的关键技术,以期为温室黄瓜的优质高产栽培提供一些技术参考。
自金融危机以来,全球经济遭到不同程度的重创。虽经过多年的发展与改善,金融危机现象得到初步缓解,各国经济逐渐恢复原先水平。但是从客观角度上来看,金融危机带来的重创影响
传统K-modes算法在分类属性聚类中有着广泛的应用,但是传统算法并不区分有序分类属性与无序分类属性。在区分这两种属性的基础上,提出了一种新的距离公式,并优化了算法流程。
寿圣寺遍布于全国各地,这一寺名的使用可追溯至北宋治平年间,宋英宗设立寿圣节,并赐使用"寿圣"为寺额。河南太康寿圣寺于明武宗正德年间重建,现仅存寿圣寺塔,香火旺盛,形成较
2014年7月31日,中国检科院与中国供销合作对外贸易有限责任公司、北京农业产业投资基金和北京中合农投投资基金管理有限公司签署战略合作协议,检科院北京万诚信用评价有限公司
【正】 我国是一个多民族的社会主义国家。各族人民在开发祖国的长期发展中,逐渐形成了许多别具一格、绚丽多采的民族节日。这些民族节日是民族风俗习惯的重要组成部分,也是
新编初中语文课本文言文注释存在对生僻义项或容易误解的词语不出注、源流不分、校勘不慎、不明通假、意译衍文等缺点,这不利于学生主动有效地学习语文.
阅读教学在语文教学中占有非常重要的地位。高中语文新课标对学生的阅读能力提出了高要求,这就需要教师立足高中语文教学实践,激发学生的阅读兴趣,从而提高学生的阅读能力。
大学室外空间的人性化塑造是社会不断进步的必然要求。舒适优雅的室外环境,促进师生、同学、朋友之间的交流和沟通,有易于学生在轻松的环境中,展示自我的才能,挖掘向上的潜能
大型学校建设工程不同于一般的商业和住宅工程,其涉及的单体众多,并且设计要求随学校使用方的要求随时作变更,使总承包单位在施工与协调管理上存在较大的难度。为此针对学校