论文部分内容阅读
近几年,马来西亚沙捞越州政府对该州的水电潜力开展了调查和评估。结果发现,许多农村地区至今仍然没有与电网连通。为此,州政府确立了在2012年以前,实现沙捞越州境内公民的供电覆盖率达到95%的目标。目前,州政府正在为偏远农村山区考虑开发利用各种小型和微型可再生能源电站。经综合分析,认为该国巴克拉兰地区最适合微型水电开发。
In recent years, the state government of Sarawak, Malaysia, conducted a survey and assessment of the hydropower potential of the state. As a result, many rural areas are still not connected to the grid yet. To this end, the state government has set a goal of 95% coverage of citizens in Sarawak by 2012. At present, the state government is considering the development and utilization of various small and micro renewable energy power stations in remote rural mountainous areas. After a comprehensive analysis, that the country’s most suitable for the Prabha Lalan mini-hydropower development.