论文部分内容阅读
唐山LNG接收站选用FMC508mm全尺寸卸料臂。通过总结接收站运行4年期间内卸料臂所产生的问题,以及与厂商进行沟通并查找相关资料,详细分析问题原因,总结问题和解决办法。有效提高解决问题的效率,降低了因卸料臂故障而影响卸料速度,耽误船期产生额外费用的可能性(图1和图2)。
Tangshan LNG receiving station selection FMC508mm full size unloading arm. By summarizing the problems arising from the unloading arm during the four-year operation of the receiving station, as well as communicating with the manufacturers and finding relevant information, the causes of the problems are analyzed in detail, and the problems and solutions are summarized. Effectively raise the efficiency of solving the problem, reduce the possibility of affecting the unloading speed due to the failure of the unloading arm and delay the additional cost of the sailing schedule (FIG. 1 and FIG. 2).