在南京玄武饭店改建(新建)20层璇宫和新增20层观光电梯及加层新建会议中心两项工程中,由于都牵涉到新的混凝土(或钢结构)与原有混凝土结构的连接问题,我们先后采取了两种锚接工艺,即环氧树脂锚接技术和HI-LTI(喜利得)植筋技术施工,现分别介绍如下: 1 环氧树脂锚接技术 1995年在改建20层璇宫和观光电梯工程中我们即采用了此项锚接技术,尤其是对东山墙外增建两台垂直观光电梯井筒,附加结构高76m,由于采用此项锚接技术加固,使得新老混凝土结构融为一体,经过三年多来的多次观察,结合面良好。
In the two projects of reconstructing (constructing) 20-storey palaces, adding 20-storey sightseeing elevators, and adding new floors of new conference centers in Nanjing Xuanwu Hotel, the connection between the new concrete (or steel structure) and the original concrete structure is involved. , We have adopted two kinds of anchoring technology, namely epoxy resin anchoring technology and HI-LTI (Hillit) planting tendon technology construction, which are respectively introduced as follows: 1 The epoxy resin anchoring technology was reconstructed in 20 layers in 1995. In the Palace and Sightseeing Elevator Project, we have adopted this anchorage technology, especially the addition of two vertical sightseeing elevator shafts outside the East Gable. The additional structure is 76m high. Due to the use of this anchorage technology, the old and new concrete structures are reinforced. Blended, after many observations over more than three years, the combined surface is good.