论文部分内容阅读
本文工程项目位于四川省简阳市,是一个商业综合体。地下室顶板结构存在11米左右的预应力梁体系,4个区域约26根。通过对预应力梁全过程施工质量控制和管理,总结了一些特殊节点施工方法和措施,经标准实施可保证有效的解决实际工程问题。本文旨在为类似预应力梁施工提供参考和依据。
This project is located in Jianyang City, Sichuan Province, is a commercial complex. Basement roof structure exists prestressed beam system about 11 meters, about 26 in four regions. Through the whole process of prestressed girder construction quality control and management, summed up some of the special node construction methods and measures, the standard implementation can ensure effective solution to practical engineering problems. This paper aims to provide a reference and basis for similar prestressed beam construction.