文章以西大滩洗煤厂铁路专用线调车绞车系统的改造为背景,分析了改造过程中的方案确定,并介绍了所采用的方案;以具体的改造措施为重点,介绍了调车绞车系统改造相应配套工程;对其所具有的经济、技术、社会和环境效益进行了分析。实践结果表明改造完成的新系统完全满足牵引能力的需求,并具有显著的技术经济效益。
This article is based on the reconstruction of the shunting winch system of the railway special line in Xidatan Coal Preparation Plant. The scheme determination in the process of rebuilding is analyzed, and the scheme adopted is introduced. The reconstruction of the shunting winch system is introduced with the emphasis on the concrete reformation measures Corresponding supporting projects; the economic, technical, social and environmental benefits it has been analyzed. The practical results show that the new system completed by transformation completely meets the demand of traction capacity and has significant technical and economic benefits.