逆作法超深基坑支护结构体系有限元分析及应用

来源 :建筑知识 | 被引量 : 0次 | 上传用户:hyflover
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
随着社会经济的不断发展,城市建设的进程不断加快,高层或超高层的建筑也越来越多。但由于城市空间和土地资源受限,这些高层或超高层的建筑在进行超深基坑开挖时很难进行放坡施工。因而,如何制定安全、有效的基坑支护结构体系是个重要课题。逆作法超深基坑支护结构体系作为一种城市施工当中的重要支护技术,在实际应用中发挥着良好的效果。本文以佛山国际商业中心二期工程为例,对逆作法超深基坑支护结构体系进行了有限元分析。 With the continuous development of society and economy, the process of urban construction is accelerating and more and more high-rise or super-tall buildings are being built. However, due to limited urban space and land resources, these high-rise or super-tall buildings are very difficult to carry out slope excavation during excavation of ultra deep foundation pit. Therefore, how to formulate a safe and effective foundation pit supporting structure system is an important issue. As a kind of important supporting technology in urban construction, the super-deep foundation pit supporting structure system with reverse working method plays a good effect in practical application. Taking Foshan International Business Center Phase II project as an example, finite element analysis is conducted on the underbracing ultra deep foundation pit supporting structure system.
其他文献
随着百万外来人口突然涌入,之前那个古老的糅合着古代城市商业与农业社会商业传统的“消费城市”北平彻底脱胎换骨,而成为现代的,集政治、军事、经济、文化、科技、交通、通讯等各种中心于一身的气象非凡的全能型城市。    1949年2月3日,清晨。  那一天,北平像往常一样寒冷,但却不似往日那般安静。早上八点,天刚蒙蒙亮,一支长长的军队便已在微弱的晨曦中,从大红门向永定门方向列队行来。  这支行进而来的部队
2009年4月22日,《南京!南京!》全国公映,反响强烈。影片是从1937年12月南京城破开始,尽管有大批的国民党士兵溃逃出城,但与此同时,也仍然有大量不愿意投降的士兵留了下来,在这座城市的街头巷尾展开了无望而惨烈的抵抗。在抵抗最终失败之后,在数十万中国人的鲜血终于染红长江之后,南京城沦为一片死地。唯一尚有生机存留的,就是位于金陵女子学院的“安全区”。然而在日军的眼中,所谓“安全区”,只不过是一个