一、工程概况朔黄铁路肃(肃宁北)黄(黄骅港)段增建二线工程,线路全长167.281公里。路基土石方430.2万方;特大桥11477延米/6座;大桥2574延米/13
First, the project profile Shu-Huang Railway Su (Sunning North) Huang (Huanghua Port) to build second-line project, the line length of 167.281 kilometers. Subgrade 430200 square meters of earth and stone; superb Bridge 11477 Yanmi / 6; bridge 2574 Yanmi / 13