芦台农场总、二扬水站是该场水利系统的枢纽,全场耕地所需灌溉用水均由该二站的机器供给。二站有电机七台,共1,250马力。建立三年来由于全体工人,特别是主要技工积极努力和艰苦的工作,创造了无事故的成绩,保证了全场稻田的及时灌溉,达到了电业系统管理工作的最高要求。三年来,工作的条件和环境是困难的,特别是1950年,总站基础漏水,所有地下电线均泡在水里,影响了电机运转,但是供水必需继续,不能停止,在这样最容易造成大事故的条件下,全站
Lutai farm total, two pumping station is the hub of the water system, irrigation water required for the entire arable land are supplied by the two stations of the machine. Two stations have seven electrical machines, a total of 1,250 horsepower. Since the founding of the three years, all the workers, especially the major mechanics, have worked hard and hard work, created an accident-free achievement and ensured the timely irrigation of rice paddies in the entire field and reached the highest requirements of the management of electrical system. Three years, the working conditions and the environment are difficult, especially in 1950, the main station leaking water, all the underground wires are soaked in water, affecting the motor running, but the water supply must continue, can not stop, so most likely to cause major accidents Conditions, the whole station