On Improved Delay-dependent Robust Stability Criteria for Uncertain Systems with Interval Time-varyi

来源 :International Journal of Automation and Computing | 被引量 : 0次 | 上传用户:zlcz1025
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper considers the problem of delay-dependent robust stability for uncertain systems with interval time-varying delays. By using the direct Lyapunov method, a new Lyapunov-Krasovskii(L-K) functional is introduced based on decomposition approach, when dealing with the time derivative of L-K functional, a new tight integral inequality is adopted for bounding the cross terms. Then, a new less conservative delay-dependent stability criterion is formulated in terms of linear matrix inequalities(LMIs),which can be easily solved by optimization algorithms. Numerical examples are given to show the effectiveness and the benefits of the proposed method. This paper considers the problem of delay-dependent robust stability for uncertain systems with interval time-varying delays. By using the direct Lyapunov method, a new Lyapunov-Krasovskii (LK) functional is introduced based on decomposition approach, when dealing with the time derivative of LK functional, a new tight integral inequality is adopted for bounding the cross terms. Then, a new less conservative delay-dependent stability criterion is formulated in terms of linear matrix inequalities (LMIs), which can be easily solved by optimization algorithms. Numerical examples are given to show the effectiveness and the benefits of the proposed method.
其他文献
This paper surveys the results of observer design for linear time-invariant(L-T-I) deterministic irreducible open-loop systems(OLS), the most basic type of OLS.
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
A new approach to model and control an unknown system using subjective uncertain rules is proposed. This method is established by combining the grey system theo
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
传统抗生素大环内酯类药物对呼吸道黏膜慢性炎症的抑制效应逐渐受到临床医师及药理学家的关注.已有大量研究表明此类药物对慢性鼻窦炎、鼻息肉患者亦有良好的疗效,并对其可能
Inter-femtocell interference becomes serious when femtocells are densely deployed. To mitigate the inter-femtocell interference, this paper proposes a cluster-b
1 “新视野”探测器飞掠冥王星rn2015年世界航天领域最重大的事件当属美国行星际探测器“新视野”(New Horizons)飞掠冥王星.
In this paper, a robust controller for electrically driven robotic systems is developed. The controller is designed in a backstepping manner. The main features