辽宁公路工程处第二工区在抚顺承包东露天矿排水沟工程中,跌水是混凝土结构,在工期紧、模板不足的情况下,从矿务局土建处学习了用秫秸代替木模板的经验。推行结果,大家认为质量合乎标准,操作也轻便。兹将制作方法及注意事项介绍如下: 制作方法一般用5公分×5公分的小楞木做带,间距30公分,用去皮秫秸(如不须拆模时可不去皮)平铺其上,压以灰条子,每隔20~25公分用2时钉钉之(见图)。
In the second work area of Liaoning Highway Construction Engineering, the concrete structure was dropped in the Drainage Gathering Project of the East TGP Open-pit Mine in Fushun. With the tight construction schedule and the lack of formwork, the experience of replacing the wood formwork with straw was learned from the Civil Affairs Bureau of Mining Bureau. The implementation of results, we believe that the quality standards, the operation is also light. The production methods and precautions will be introduced as follows: The production method generally with 5 cm × 5 cm of small fringed wooden do, with a pitch of 30 cm, with peeled straw (such as without demolition can not peel) on the tile, Pressure to gray strips, every 20 to 25 cm with 2 nailing nail (see photo).