棚洞是整治山区铁路大规模危岩落石灾害的常见措施,其结构形式往往受各种因素的影响而各有特点。该文以成昆线“8.30”地震灾害复旧工程控制性工程-成昆铁路新江站新建悬臂棚洞工程为例,在方案比选中从技术、经济及施工便利性等综合因素考虑,设计出国内少见的具有高立柱、大悬臂特点的棚洞方案,不仅有效的治理了落石灾害,节省了投资,也较好的处理了工程建设与既有铁路运营的相互影响,为既有铁路上修建复杂棚洞工程积累了宝贵的经验。
Shed hole is a common measure for remediation of large-scale rock-fall disaster in mountainous railway. Its structure is often influenced by various factors and has its own characteristics. Taking the new project of cantilever shelter project of Chengjiang-Kunming Railway Line “8.30” Earthquake Disaster Rehabilitation Project - Xinjian Railway Station in Cheng-Kun Railway as an example, from the aspects of technology, economy and construction convenience, The design of a rare shelter scheme with high column and large cantilever in China not only effectively manages the rockfall disaster and saves investment but also better deals with the interaction between the project construction and the existing railway operation. On the construction of complex shed project has accumulated valuable experience.