龙羊峡水电站位于青海省共和县,其单机容量是目前我国最大的,也是国内海拔最高(2448米)的大型水电站之一。电站最高水头150米;设计水头122米;最小水头99.5米;发电极限最低水头76米。水头变幅74米,占设计水头的60%。水头变幅之大是该电站又一个特点。水轮机型式:HLD06_A-LJ-600,由东方电机厂制造。水轮机最大出力35.61万千瓦;额定出力为32.56万千瓦;额定转速125转/分;飞逸转速56转/分;水轮机最高效率93%;吸出高度—3.5米。本文拟就D06_A新转轮的研究过程和主要成果作一简单介绍。
Longyangxia Hydropower Station is located in Gonghe County, Qinghai Province, and its stand-alone capacity is currently the largest in China. It is also one of the largest hydropower stations in China with an elevation of 2448 meters. The highest head of the power plant is 150 meters; the design head is 122 meters; the minimum head is 99.5 meters; and the minimum power generation head is 76 meters. 74 meters head change, accounting for 60% of the design head. The large head variation is another feature of the power station. Turbine Type: HLD06_A-LJ-600, manufactured by Dongfang Electrical Machinery Factory. Turbine maximum output of 356,100 kilowatts; rated output of 325,600 kilowatts; rated speed of 125 rev / min; run-off speed of 56 rev / min; turbine maximum efficiency of 93%; suction height of -3.5 meters. This article will make a brief introduction on the research process and main achievements of D06_A new runner.