论文部分内容阅读
北五联合站于2010年进行改造,对生产工艺进行了优化调整,增加聚驱采出液的处理工艺。调整改造后,各站信号引入新建中央控制室,值班人员集中对全站进行监控。中央集控系统运行后,取消现场操作人员,值班人员在中央控制室完成监控生产数据、工艺参数控制等工作,全站共计优化岗位人员25人,为油田自动化、信息化,数字化建设奠定了可靠的基础。
North Fifth Joint Station in 2010 to carry out the transformation of the production process has been optimized to increase the poly-drive recovery of liquid processing technology. After the adjustment and transformation, the signal of each station was introduced into the newly-built central control room, and the duty personnel focused on monitoring the whole station. Centralized control system operation, the abolition of on-site operators, duty personnel in the central control room to complete the monitoring of production data, process control and other parameters, the total station optimization of the total staff of 25 people, for the oilfield automation, information technology, digital construction has laid a credible Foundation.