防洪墙是主要承受水平荷载的结构,通常采用混凝土或者浆砌石重力式结构、混凝土悬臂式、混凝土扶臂式等结构。一般要求结构不能产生水平向变形。而桩基础的水平承载力恰恰需要水平变形,才能发挥出水平承载力。文章首次从桩基础防洪墙现状存在的渗漏、变形等现象出发,找出地基防渗和水平承载力不满足要求等问题。分析上部重力式结构与基础桩基如何协调工作。对于承台基土的水平承载力,除规范规定的不应计取的情况外,笔者还提出了自己的观点。 Flood wall is the main load to withstand the structure, usually using concrete or masonry gravity structure, concrete cantilever, concrete arm structure and so on. The general requirements of the structure can not produce horizontal deformation. The horizontal bearing capacity of pile foundation just needs horizontal deformation, in order to exert horizontal bearing capacity. For the first time, the article starts from the phenomena of seepage and deformation in the status quo of the foundation wall of the pile foundation, and seeks out some problems such as seepage prevention of foundation and horizontal bearing capacity which do not meet the requirements. Analysis of the upper gravity structure and foundation pile foundation how to coordinate work. For the bearing capacity of bearing capacity of foundation soil, in addition to the norms should not be taken into account the circumstances, I also put forward their own point of view.
其他文献
艾里克塔木防洪段河道基本没有修建永久性的防洪设施,防御洪水能力弱,每年汛期都有不同程度的洪灾发生,洪灾发生的范围主要位于叶尔羌河弯道,因此要通过防洪工程提高防洪标准
期刊
随着现代生活水平的提高,人们对医疗护理服务期望值越来越高,以人为本是21世纪的宗旨,以患者为中心已成为新的医疗体系下医护工作的出发点和落脚点,护士的工作也由单纯的完成护理
例1:10岁。因脐周疼痛8天,于1996年4月16日入院。患者于8天前出现脐周持续性剧痛,向右肩及会阴部放射,伴频繁呕吐及发热,到当地就诊,发现左下腹肿物转入我院。查体:左下腹触及一约8cm×8cm×6cm肿物,质硬,可
期刊
随着水利事业的发展,对于灌区量水的技术要求越来越高。通过对目前国内主要灌区量水技术的对比综述的方法,对各种量水技术的优缺点进行分析和对比,阐述了在不同环境条件下应
近年来,随着水利工程事业发展蒸蒸日上,各地的水利工程建设质量和速度有了显著提高。但是,一些问题也随之产生,例如,目前在我国,能够适应水利工程建设需求的地基还比较稀缺,
期刊
期刊
期刊
期刊