南京国际展览中心二层框架为大面积预应力混凝土不设缝结构 ,平面采用纵横后浇带 ,预应力筋用连接器连接。施工中采用针对性措施 ,解决了张拉端部固定、穿束、预应力筋连接和孔道灌浆中的技术难点 ,并运用现代管理方式组织大面积预应力施工 ,有效地控制了梁板中的混凝土温度应力
Nanjing International Exhibition Center, the second floor of the framework for a large area of prestressed concrete without seam structure, the plane with vertical and horizontal post-pouring tape, prestressed tendons connector. During the construction, the concrete measures were taken to solve the technical difficulties of fixing the end of the tension, passing the beam, connecting the prestressed tendons and grouting in the tunnel. The modern management mode was adopted to organize large-area prestressed construction to effectively control the concrete temperature in the slab stress