如何提高750kV变电站运行人员的监盘能力

来源 :中国科技信息 | 被引量 : 0次 | 上传用户:hudie8707180910
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
750kV变电站是宁夏电网投资建设的新一级电压等级的变电站,它的建成加强了西北750kV电网间的联络,优化了宁夏现有电网结构,大大提高了宁夏电网与西北功率交换能力,加快了自治区能源优势转化为经济优势的步伐。然而新设备、新人员给750kV变电站的安全稳定运行带来了巨大的压力,因此提高人员的监盘能力是750kV变电站运行人员目前工作的重要任务之一,本文以“如何提高750kV变电站运行人员的监盘能力”为出发点,为变电站运行人员进行准确的监盘工作提供一个简单的平台。 750kV substation is a new level of voltage substation invested and constructed by Ningxia Power Grid. The completion of the 750kV substation has strengthened the contact of 750kV power grids in northwest China, optimized the existing power grid structure in Ningxia, greatly enhanced the power exchange capacity between Ningxia Power Grid and Northwest China, Energy advantage into the economic advantages of the pace. However, new equipment and new personnel have brought tremendous pressure on the safe and stable operation of 750kV substation. Therefore, improving the capacity of personnel monitoring is one of the most important tasks for 750kV substation operators. This paper focuses on how to improve the operation of 750kV substation operators Monitoring capacity "as a starting point for substation operators to provide accurate monitoring work to provide a simple platform.
其他文献
本文从状态估计软件工程调试的角度,在网络模型、电网参数、设置权重、开关状态辨识等方面介绍了威海电网提高遥测估计合格率的一些措施,这些方法和经验显著提高了遥测估计合格