高温条件下稀浆混合料的可拌和时间显著缩短,直接影响微表处施工效果。通过提高集料温度及室外高温拌和摊铺,模拟实际工程中的高温情况,研究了乳化沥青生产时的乳化剂用量、拌和时的水泥用量、外加水量、外加水中添加乳化剂等措施,对常温和高温下改善可拌和时间的效果进行比较。结果表明:拌和时增加外加水中的乳化剂用量,是延长夏季高温时可拌和时间的有效措施。
Mixing time under high temperature slurry mixture significantly shortened, a direct impact on the construction effect of micro-surfacing. By raising aggregate temperature and outdoor high temperature mixing paving, the simulation of the actual project of high temperature, the emulsified asphalt production of emulsifier dosage, the amount of cement mixing time, additional water, add water emulsifier and other measures to normal temperature Compared with the effect of improving the mixing time at high temperature. The results show that increasing the amount of emulsifier in the additional water during mixing is an effective measure to prolong the mixing time in high temperature in summer.