为适应甘蔗生产的发展,近年来,我厂制糖生产能力不断提高,日榨量由3,200吨提高到4,500吨,在挖潜改造的同时节能方面也做了一些工作,取得一定成效。1978年和79年检修期我们改造了三台131-18-16/300型锅炉,每台增加了有效辐射受热面积43.5米~2,比较合理地怖置辐射受热面,提高了锅炉出力。在适当的负荷下提高了锅炉热效率。80年扩建了一台L-36/39-W/I型中压链条锅炉,配了3,000千瓦背压汽轮发电机组,使得热电得到
In order to adapt to the development of sugar cane production, in recent years, the sugar production capacity of our factory has been continuously raised. The daily volume of pressed sugar has been raised from 3,200 tons to 4,500 tons. Some efforts have been made in the energy saving while tapping potential and achieving some success. In 1978 and 79, we renovated three 131-18-16 / 300 boilers, each of which increased the effective radiant heat area by 43.5m ~ 2, which made it more reasonable to expose the heating surface to radiation and improve the boiler output. Boiler thermal efficiency is increased at the right load. In the 1980s, an L-36/39-W / I medium-pressure chain boiler was expanded and equipped with a 3,000-kilowatt back pressure turbine generator to make the thermoelectric power generation