安钢第二炼轧厂1780拥有3台卷取机,属于热连轧最后一道工序,位于精轧机层流冷却后,通过卷取机的交替工作,将不断轧制好的钢板卷成钢卷,再由卸卷小车将钢卷卸出卷取机后,通过快速链,步进梁,提升机等设备把钢卷运送到钢卷库。卷取机是其中必可可少的环节,而卷取机正常使用,对于1780生产线轧制节奏和钢卷的成材率,起着至关重要的作用,是提升热连轧生产线竞争力的重要一环,确保钢材成本在激烈的市场竞争中处于优势地位。
Angang No.2 Steelmaking Plant 1780 owns 3 coilers and belongs to the last process of hot tandem rolling. After being cooled by laminar flow in the finishing mill, the rolling steel plate is rolled up through the alternation of winders , Unloading the car after the coil unloaded from the coiler, through the fast chain, walking beam, hoist and other equipment to the coil delivered to the coil library. Winding machine is one of the most essential part, and the normal use of coiler, for the 1780 production line and steel rolling rhythm of the rate of success, plays a crucial role in enhancing the competitiveness of hot tandem mill production line an important Central, to ensure that the cost of steel in the fierce competition in the market in a dominant position.