华丰井田4煤层顶板砾岩水突出影响因素分析

来源 :中国矿业大学学报 | 被引量 : 0次 | 上传用户:diger
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在分析砾岩分布特征及其水文地质特征的基础上,以矿山压力控制理论为指导,运用岩层沉降理论推断了华丰矿1409工作面在采厚为6.5m的情况下,导水裂隙带发育高度为96.2m,揭示了导水裂隙能够导致顶板砾岩水突出.结合矿山压力观测资料和顶板突水量资料,阐述了矿山压力和顶板砾岩突水突出之间的因果影响关系.根据2407工作面冲击地压监测资料,阐明冲击地压对顶板突水的促进作用.建立了顶板水沿工作面下平巷突出运移的模型,阐明了斑裂线是导致砾岩水大量突出的主要导水通道. Based on the analysis of the distribution characteristics of conglomerate and its hydrogeological features, taking the theory of mine pressure control as a guide, the rockfall settlement theory is used to infer that the development of water-conducted fracture zone under the condition of mining thickness of 6.5m in Huafeng Coal Mine 1409 face The height is 96.2m, revealing that the water-leading fracture can cause the conglomerate water to protrude from the roof.According to the mine pressure observation data and the roof water inrush data, the causal relationship between mine pressure and roof conglomerate water inrush is expounded.According to 2407 working face Rockburst monitoring data to clarify the role of rockburst in promoting water inrush of roof.The model of roof water movement along the roadway under the working face is set up to illustrate that the spot-break line is the main water-conducting channel leading to a large number of conglomerate water prominence.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
[编者按]聚脲是国外近十几年来刚兴起的一种高性能新型环保材料,其优异的防水、防腐、高强耐磨等性能和机械喷涂、快速固化的施工特点完美结合,在工程应用中显示出无可比拟的
随着城市化水平提高,建筑工程的需求日益增加和质量不断推进,在建筑工程中提高建筑稳定性设计就显得尤为突出和重要.通过对钢结构的整体、局部和平面外设计引入稳定的理念,克
期刊
本文对目前石油建设工程质量检测评定标准存在的问题进行分析,并为解决问题提出专业的措施,以此提高我国石油建设工程的质量.