论文部分内容阅读
在考虑跨区省输电的综合资源规划方法的基础上,研究如何在规划中考虑减排成本,促进排放率低的发电资源更多地参与规划。结合我国的电力规划以及发电、输电资源的现状,提出了考虑减排成本的综合资源规划方法。介绍了考虑跨区省输电的综合资源规划模型,以综合能源成本为准则,对省区内外的各种资源进行筛选,得出总成本最小的电力资源组合,然后将减排成本计入综合资源规划,使系统排放量达到最优水平,最后以我国某省的实际数据验证了该模型的实用性。
Based on the comprehensive resource planning method of trans-regional power transmission, this paper studies how to consider the emission reduction cost in planning and promote more participation in the planning of power generation resources with low emission rate. Combined with the power planning in our country and the status quo of power generation and transmission resources, an integrated resource planning method considering the cost of emission reduction is proposed. In this paper, a comprehensive resource planning model considering trans-regional power transmission is introduced. Based on the integrated energy cost criterion, various resources inside and outside the province are screened to obtain the power resource combination with the lowest total cost. Then, the emission reduction cost is included in the comprehensive resources Planning, so that the system emissions to the optimal level, and finally the actual data of a province in our country to verify the practicality of the model.