我厂2号高炉1989年易地扩容大修后,于1990年11月5日点火开炉。炉喉钢砖由冶金部包头钢铁设计研究院设计,由包钢二冶施工安装,钢砖由包头铸钢件厂铸造加工。 1994年8月2号炉停炉喷补炉衬,检查炉喉钢砖时,只有东南面一块(从正西合门壁砖顺时针方向数,第26块砖)下部2/3处鼓起一个包。其主要原因是钢砖下部耐火材料脱落,当时怕影响布料,建议将鼓包割掉。后来感觉影响不大,没割。其余钢砖基本完好,下部有轻微烧损变形。
I plant on the 2nd blast furnace in 1989 after the expansion of overhaul, in November 5, 1990 ignition furnace. Furnace throat steel by the Ministry of Metallurgical Baotou Steel Design and Research Institute designed by the Baotou Second Metallurgical Construction and Installation, the steel from Baotou Steel Casting Factory casting processing. August 2, 1994 furnace shut down furnace lining, check the stove steel lag, only a southeast (from the West together with the wall of the door number of tiles, the first 26 blocks) lower 2/3 bulge one package. The main reason is the lower part of the refractory brick fall off, then fear of affecting the fabric, it is recommended to remove the bulge. Later, I feel little influence, did not cut. The rest of the steel is basically intact, the lower part of a slight burning deformation.