论文部分内容阅读
In a district heating and cooling system, i.e. Beijing combined heating cooling and power (CHCP) system studied here, high temperature water generated by two cogeneration plants circulates through a network between the plants and heat substations. At heat substations, supply water of high temperature from the network drives absorption chillers for air conditioning in summer and meets space heating demands in winter or domestic hot water demands by heat exchangers in the whole year. The parameters, i.e. supply/return water temperature in the network, has a great impact on primary energy consumption (PEC) of the absorption chillers, circulation pumps and domestic hot water (DHW), which is studied in this paper.
In a district heating and cooling system, ie Beijing combined heating cooling and power (CHCP) system studied here, high temperature water generated by two cogeneration plants circulates through a network between the plants and heat substations. At heat substations, supply water of high temperature from the network drives absorption chillers for air conditioning in summer and meets water heating demands in winter or domestic hot water demands by heat exchangers in the whole year. The parameters, ie supply / return water temperature in the network, has a great impact on primary energy consumption (PEC) of the absorption chillers, which is studied in this paper.