论文部分内容阅读
(1)裂缝的处理。将裂缝凿成“V”形,用纯水泥浆扫刷1遍,再用1:1水泥砂浆填塞“V”形槽,压实、抹光,待水泥砂浆12小时凝固后,再用纯水泥浆刷3~4遍。(2)抹灰层翘壳或剥落现象的处理。将其铲除,冲洗干净,重新按抹灰施工操作程序,分层上灰,薄抹重压,涂刷纯水泥浆。(3)渗水的处理。
(1) crack treatment. The cracks were cut into “V” shape, with pure cement brush sweep 1 times, then 1: 1 cement mortar stuffed “V” groove, compaction, trowel, until the cement mortar 12 hours after solidification, Mud brush 3 to 4 times. (2) Plastering layer or peeling off treatment of the phenomenon. The eradication, rinse, re-press plastering construction procedures, layered ash, thin plaster, brushing pure water slurry. (3) seepage treatment.