论文部分内容阅读
5月5日至8日,由黄委会水土保持局和黄河上中游管理局共同组成的检查组,会同山西省水土保持局,采取抽查的方式,对晋中市、吕梁市和太原市的淤地坝防汛责任落实、在建淤地坝度汛安全与动态信息报送、病险淤地坝除险加固及度汛应急预案落实、淤地坝运行管理及经费落实、淤地坝前期工
From May 5 to May 8, the inspection team composed of the Yellow River Reservation Bureau of Soil and Water Conservation and the Upper and Middle Yellow River Management Bureau, together with Shanxi Provincial Soil and Water Conservation Bureau, adopted a random sampling method to examine the impacts of Jinzhong, Luliang and Taiyuan Implementation of flood control responsibility for siltation dam, flood control and dynamic information submission of silt dam under construction, reinforcement of dangerous silt dam and implementation of flood emergency plan, operation and funding of silt dam operation, pre-siltation dam pre-construction