下葛兰奈特船闸是陆军工程师团沃拉沃拉工区设计的,并取得了水工模型试验的验证.该闸闸室宽86英尺,长675英尺,设计水头105英尺。该闸的输水廊道布置,首次采用底部纵向输水廊道系统。此种输水系统是唯一能够满足高水头船闸快速和安全充水要求的。它的基本原理是:运用一侧或二侧输水廊道阀门,均可使水流平稳、均匀地进入闸室。1975年船闸工程竣工并投入了运转。现场原型试验表明,除充泄水时间较快和掺气较多外,其充水特性与模型试验的非常接近。阀门操作稳定、平静,没有发生过去修建的高水头船闸发生过的巨大爆破声响。
The Lower Gerante Lock is engineered by the Army Division’s Walla Walla work area and has been validated by a hydraulic model test that is 86 feet wide by 675 feet and has a design head of 105 feet. The gate’s waterway corridor layout, for the first time using the bottom longitudinal waterway corridor system. This type of water delivery system is the only one able to meet the fast and safe water filling requirements of high head locks. Its basic principle is: the use of one or both sides of the waterway corridor valve, can make the water flow smoothly and evenly into the lock chamber. 1975 ship lock project completed and put into operation. The field prototype tests showed that the water-filling characteristics of the water-filled materials were very close to those of the model tests except that the filling and discharging time was faster and the gas was more aerated. Valve operation is stable, calm, without the occurrence of the past, the construction of a high head lock occurred a huge blasting sound.