秋寒当心假感冒

来源 :农家参谋 | 被引量 : 0次 | 上传用户:
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
入秋后昼夜温差逐渐加大,白天有时仍然很热,但是到了夜晚,可能上半夜时还是闷热难耐,而下半夜或凌晨时就有可能转凉,人们容易放松对寒凉的警惕性,感冒趁机而入,此时有四种假感冒也来偷袭了。立秋之后,早晚温差逐渐变大,很多人身体一时难以改变夏日生活习惯,感冒病毒便乘虚而入。在季节交替之际,有几种常见病和感冒初期症状相似,医生提醒,要注意区分这些症状,对症下药,否则会延误病情。1.鼻炎:打喷嚏、鼻涕多、鼻子堵,早起一出 After the fall, the temperature difference between day and night gradually increases, sometimes it is still hot during the day, but at night, it may be sultry at midnight, but it may turn cooler in the middle of the night or in the early hours of the morning, people may easily relax their vigilance against the cold and catch a cold Take the opportunity to enter, there are four fake cold also attacked. After the beginning of autumn, the temperature difference gradually becomes larger sooner or later, and many people find it hard to change their summer habits. In the season of the occasion, there are several common and early symptoms of cold, doctors advise, pay attention to distinguish between these symptoms, the right medicine, otherwise it will delay the disease. 1. Rhinitis: sneezing, nose and more nose blocked, get up early
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
轨道交通工程为城市交通管理中主要的交通项目之一,其在实际运行中通信工程项目,为重要的基础支持项目之一.实际分析落实良好的通信工程项目进度管理,对于工程施工的稳定发展
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
工艺管道是石油化工生产过程中的重要通道,起着运输物料、传递能量的重大作用.本文深入分析了石油化工工艺管道安装工程施工管理中的常见问题,并针对这些问题提出了相应的解
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥