文章就秦皇岛港煤码头四期工程 10万吨级泊位沉箱水上接高的三种施工方案进行了技术、经济等方面比较,确定最优的施工方案。
This article has carried on the technical, economical and so on the three kinds of construction plans about the caisson that the 100,000th class berth of the fourth phase of Qinhuangdao Port coal terminal projects, then determines the optimal construction plan.